Hargeisa Water Agency Logo Hargeisa Water Agency
    • Home
    • About
    • Reports & Updates
    • Departments
      • Human Resource Management
      • Administration and Finance Department
      • Department of Planning
      • Commercial and Billing
      • Technical Department
      • Water Production Department
      • GIS-Geophraphic Information System
    • Centers
      • Center for Digitalization and Water Tech
      • Centre For Ground-Water and Surface Management
      • Hargeisa Water Quality Control Laboratory
    • Contact
May 22, 2025
May 22, 2025 3 min read

The Hargeisa Water Agency proudly announces the successful filling of the Kalqoray Dam, the largest dam in Somaliland, marking a significant achievement in the nation's history and poised to revolutionize its water infrastructure. Located in the semi-desert region surrounding Hargeisa, this monumental dam has created a vital reservoir capable of sustaining the population through an extended drought period of up to two years, although it is the Agency's sincere hope that such prolonged dry spells will not materialize. This accomplishment stands as a testament to the dedication and expertise of the Hargeisa Water Agency's team, demonstrating the potential of government institutions to achieve remarkable feats even with constrained financial resources and a committed, skilled workforce at the helm. The Kalqoray Dam is an unprecedented project in Somaliland, distinguished by its immense size and water retention capacity. Currently filled to its maximum, the dam holds an impressive 1.5 million cubic meters, equivalent to 7 million barrels of water. To illustrate the scale of this resource, the average household in Hargeisa consumes approximately 20 barrels of water each month. The completion and filling of the Kalqoray Dam signify a major step forward in ensuring water security and fostering sustainable development for the region.

Screenshot 2025-05-21 100240

The Kalqoray Dam, due to its substantial dimensions and significant water volume, presents potential hazards for the nearby community. Of particular concern is the safety of animals and children, who may be at increased risk of harm should they engage in imprudent behavior such as attempting to swim in the reservoir. The Hargeisa Water Agency urgently appeals to residents in the vicinity to exercise extreme caution when near the dam's location. The agency emphasizes the importance of allowing sufficient time for the planned safety measures, specifically the installation of a perimeter fence, to be fully implemented. This essential work is already in progress and is being expedited to ensure the safety and well-being of the community as quickly as possible. The Hargeisa Water Agency requests the community's full cooperation and vigilance during this crucial period.

Screenshot 2025-05-21 100208

The Hargeisa Water Agency anticipates substantial benefits for the local community from this dam project. Specifically, farms situated in close proximity to the dam will be prioritized to receive both direct and indirect advantages. The creation of this significant water reservoir is expected to dramatically improve access to underground water resources for these agricultural operations, making it easier and more efficient to secure the necessary water for irrigation and other farming needs. This improved access will likely lead to increased agricultural productivity, potentially enabling farmers to expand their operations and diversify their crops. Furthermore, the dam is expected to have broader indirect benefits for the surrounding community, such as contributing to a more stable water supply for various purposes, potentially enhancing local economic activity and overall well-being. Recognizing the crucial role of community involvement in the successful completion and long-term viability of this project, the Hargeisa Water Agency earnestly requests the cooperation of residents and, in particular, the farmers residing near the dam site. Their assistance in clearing the designated area is essential for the construction process. Moreover, the agency emphasizes the shared responsibility of ensuring the safety and security of both the dam infrastructure and the community itself. Collaborative efforts will be vital in mitigating potential risks and maximizing the positive impact of this significant development for all stakeholders. The Hargeisa Water Agency believes that by working together, they can create a sustainable and mutually beneficial outcome that will contribute to the prosperity and resilience of the region.

Abdilahi Omar

Head of Public Relations and Communications at Hargeisa Water Agency

@https://x.com/suber_omar

Share This Article

Facebook X WhatsApp

Related Articles

Building a Better Hargeisa: Progress on the Liquid Waste Management Front
Building a Better Hargeisa: Progress on the Liquid Waste Management Front
May 08, 2025 5 min read
Sustainability WasteManagement
Remarks by of the Minister of Environment and Climate Change, Minister Abdilahi Jamac Cisman (GeelJire) on Hargeisa Water Expansion
Remarks by of the Minister of Environment and Climate Change, Minister Abdilahi Jamac Cisman (GeelJire) on Hargeisa Water Expansion
May 08, 2025 3 min read
Climate Change Environment
Hargeisa Agency Inaugurates New Borehole Amidst Community Generosity and Collaborative Spirit
Hargeisa Agency Inaugurates New Borehole Amidst Community Generosity and Collaborative Spirit
May 08, 2025 4 min read
Governance Sustainability
"New Parts of Hargeisa Will Have Running Water": Hargeisa Water Agency General Manager Details Project Timeline
"New Parts of Hargeisa Will Have Running Water": Hargeisa Water Agency General Manager Details Project Timeline
May 08, 2025 5 min read
Hargeisa Water Expansion Project Somaliland
« Back to News
About Us

Connect With Us
Quick Links
    • Home
    • About Us
Resources
    • Reports and Updates
Get in Touch
Water Agency Headquarters

Shacabka Road

info@wateragency.com

9222


© 2025 Water Agency Site. All rights reserved.

Privacy Policy Terms of Service